According to the Housing Industry Association, it takes between 13 and 25 days (on average) to complete the installation of a full bathroom as part of a renovation. Depending on the scope of your bathroom renovation, it may take between 3 and 12 weeks. The planning and design phase often takes longer, especially if you're still deciding on the design style of your bathroom. How long does it take to install a new bathroom? For context, makeovers of small bathrooms without repositioning pipes or tiles can take 1-2 weeks once materials are delivered.
Standard bathroom renovations without tiles or plumbing can take 4 to 6 weeks. Larger structural and luxury renovations can be extended to 8 weeks (or more) depending on permits, materials, and issues such as hidden leaks and asbestos. These are only estimates, since the actual renovation depends on your situation. This breakdown should give you an idea of the timelines for bathroom renovation in Sydney.
On my first appointment with clients, I always give a clear indication of how long a project should last. And when I say “your bath from start to finish will last approximately six weeks”, it gives me a look of complete shock. If you're a designer or builder, I know you'll be nodding your head in agreement. Reality television has completely eliminated any realistic expectations about how long renovations take.
As simple as it may seem, this is one of the most crucial phases in a bathroom renovation because you and your contractor need to understand what you want to achieve. We love designing and building bathrooms with new and innovative products to turn your bathroom dream into reality. Allow extra time to complete your bathroom renovation and you won't be disappointed if there is a slight delay. The reason they show completely stripped and renovated bathrooms in just a few episodes is because there is no way on earth that they will hold your attention if you feel through a real-life renewal.
Whether you hire a contractor to do it all or manage the project and do it yourself, bathroom renovation has many phases that can vary in length. Construction oversights, cutbacks and inaccurate predictions of deadlines can have a catastrophic impact on your plans and budget, which is why it is so important to work with experienced specialists such as DCON Group, who understand the complexities and problems of renovating a bathroom. Generally speaking, most bathroom renovations in Australia follow a structure similar to that described below. In most cases, renovating a bathroom takes up to a month after work starts, but it can take up to two months.
When you read the bathroom renovation schedule, you will see that everything needs to be completed in order. However, keep in mind that these are general guides and averages and that each bathroom renovation has its own set of unique factors. After the demolition has taken place and the bathroom is now a skeleton, plumbers and electricians are brought in to redirect and restructure the plumbing lines and wiring to fit your new bathroom plan. Before you embark on your bathroom renovation journey, it's a great idea to get a little understanding of what will happen, when and how long each stage of your renovation will last.
Bathroom renovators do their best to complete their work on time, but even they have to schedule exchanges.